Pacific Trail Pipelines will provide a direct connection between the Spectra Energy Transmission pipeline system and the Kitimat LNG terminal for the transportation of natural gas from Western Canada to Asian markets.
Quick Facts:
-
Estimated cost of project: Approximately $1 billion
-
Pipeline location: Summit Lake to Kitimat, British Columbia
-
Pipeline length: Approximately 463 km
-
Pipeline capacity: Up to approximately 1,000 MMcf/d
-
Compressor station: 1
-
Date of operation: 2015
|
|
|