Pacific Trail Pipelines will provide a direct connection between the Spectra Energy Transmission pipeline system and the Kitimat LNG terminal for the transportation of natural gas from Western Canada to Asian markets.



KSL Pipeline Project
Click to enlarge

Quick Facts:

  • Pipeline location: Summit Lake to Kitimat, British Columbia
  • Pipeline length: Approximately 463 km
  • Pipeline capacity: Up to approximately 1,000 MMcf/d
  • Compressor station: 1
  • Diametre of pipe: 42 inches